Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of a master plan through the park design process and phase 1 development.Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
William R. Gaines Jr. Veterans Memorial Park
Last Updated: 03/01/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.Placida West Boat Ramp Expansion
Last Updated: 03/01/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Ainger Creek Boat Ramp Replacement
Last Updated: 03/01/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Landfill Scale House (Zemel Road)
Last Updated: 03/01/2024 Category: County Facilities Current Phase: Construction
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Last Updated: 02/29/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Marathon Boulevard PathwaySunset Boulevard East Sidewalk
Last Updated: 02/29/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Sunset Boulevard East Sidewalk