Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 03/13/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded.Last Updated: 03/13/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Gulf Cove SidewalksCaring Way and Brinson Avenue Sidewalks
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksMidway Boulevard Sidewalk (HB41)
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Design Development
Dorchester Street SidewalkRampart Blvd. Sidewalk phase 3
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Rampart Blvd. Sidewalk phase 3Rampart Blvd. Sidewalk phase 2
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Rampart Blvd. Sidewalk phase 2Last Updated: 03/13/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.